Eroom Technology Co., Ltd.

Steam and Water Sampling System

Contact Now* Send an Inquiry to this supplier.
or
Start Order * Name your price

Browse by Category

Contact us

Eroom Technology Co., Ltd.
[Korea]

Address
897-1, Hogye-dong, Dongan-gu Anyang-si Gyeonggi-do
Phone
82-31-4534006
Contact name
Jun-sang, Lee

Description

System Description

In industrial plants such as fossil power, nuclear power, HRSG, co-generation, auxiliary boiler unit etc., where cycling water is the process medium for producing electricity, steam, heat or combination of those, maintaining the quality of water as specified is critical task for guaranteeing the design life and performance of the plant.

Objective of Steam and Water Sampling System is to monitor the quality of sample steam and water that are transported to the system from various points of plant. Samples brought to the system are conditioned first so that their pressure, temperature, flow rates etc. are agreeable with those required by the on-line analyzers installed in the system and also for manual sample taking.

Type of on-line analyses to be performed in the system depends on application and decision of plant design engineers. pH, conductivity and dissolved oxygen values are most frequently measured and silica, sodium, chloride and Fe ion concentrations are additionally monitored when needed. Analysis results are indicated and recorded at the system control panel and/or transmitted to remote facilities for determination whether plant chemistry is being maintained as scheduled and also whether significant components of the plant cycle are being operated in good conditions.

Experiences of Eroom Technology

For more than ten years of business in this field, Eroom has experienced all different kinds of applications with diverse technical challenges.

Followings are selected example of Eroom's experiences in Steam and Water Sampling System.

  • Conventional (fossil) Power Plant
    • Yeosu TPP # 1&2, South Korea
    • Hadong TPP # 5&6, South Korea
    • Seoul TPP # 4&5, South Korea
    • Termonorte Phase II, Brazil
    • Younghung TPP # 1&2, South Korea
  • Combined Cycle Power Plant
    • Ulsan CCPP, South Korea
    • Boryeong CCPP #1~4, South Korea
    • Bukok CCPP # 1&2, South Korea
    • Kwangyang CCPP, South Korea
    • Incheon CCPP, South Korea
    • Fars CCPP, Iran
    • Haripur CCPP, Bangladesh
    • Fujairah CCPP, UAE
    • Rehab CCPP, Jodan
    • Mapna 22 Units CCPP, Iran
  • Nuclear Power Plant
    • Ulchin Nuclear Power Plant Unit 5, South Korea
    • Ulchin Nuclear Power Plant Unit 6, South Korea
    • Wolsung Nuclear Power Plant Unit 1, South Korea
    • Wolsung Nuclear Power Plant Unit 2, South Korea
  • Cogeneration Plant
    • BASF Yeosu, South Korea
    • Honam Petrochemical, South Korea
    • Dongyang Cement Waste Heat Boiler, South Korea
    • Kimpo LFG Power Plant, South Korea
  • Auxiliary Boiler unit
    • Sidpec Project, Egypt
  • Incinerator Plant
    • Sanbuk Incinerator Plant, South Korea
  • District Heating Plant
    • Banwol NO.5, South Korea
    • Gumi Cogeneration, South Korea


Product Image

  • Steam and Water Sampling System image

Send an Inquiry to this supplier

Send an Inquiry to this supplier
* From
  To Jun-sang, Lee
Eroom Technology Co., Ltd.
* Buying Product
- Please enter your specific buying item.
e.g. 42 inch LCD TV, leather executive chair
Category : Other Manufacturing & Processing Machinery
* Message

Use English only Max. 2000 characters. (Min. 20)

Send
EC21.com does not guarantee the validity of product information or the credentials of sellers.

Browse: Manufacturer Directory Premium Suppliers Site Map

About EC21 Contact Us Terms & Conditions Report Item Online Trading Risks Product Listing Policy

Copyright (c)1997-2026 EC21 Inc. All Rights Reserved. EC21 in KoreanChinese

Business Registry Number: 120-86-03931 | Mall order sales Registration Number: 강남-5838